Home Back

CLARK CEMETERY, AUGUST 2000

1. The following is the VFW Post 2485 Clark Cemetery Report for August.

 

A. Two U.S. veteran donated 199 man hours working on cemetery projects this month.

(1) Four local hires worked 760 man hours over 24 work days.

(2) The Clark Development Corporation (CDC) contract trash and leaves cleanup crews worked every day.

B. Total expenditures for August 2000 were (P 41,396.00). The expenditure sheet for the month is attached.

C. Flag inventory: The flags were changed August 3 and replaced with a set of repaired flags.

(1) Six sets of new flags

(2) One set of repaired flags

D. Burial ceremonies:

(1) The Cremated remains of Roland D. Chamberland, TEC 4, U.S. Army, were buried at the Clark Cemetery August 4. Grave side services were conducted by VFW Post 2485.

(2) Earl Luis Richell, E8, U.S. Army, was buried at the Clark Cemetery August 23. Grave side services were conducted by VFW Post 2485.

(3) Michael D. Boon, TSgt., U.S. Air Force, Was buried at the Clark Cemetery August 24. Grave side services were conducted by American Legion Post 123.

E. Remarks:

(1) ALCON are advised that if you/your organization wish to receive this report by E-mail, send your E-mail address to [email protected].

(2) As of August 31, the Grave Diggers membership stands at 480.

Yours in Comradeship,

 

Al Mitchell

Chairman, Clark Cemetery Committee

Support this site by joining Going Platinum FREE !!! Join Going Platinum

Clark Cemetery Financial Report

 August 2000

All amounts in Philippine Peso's

Date

Item

Debit

Credit

Balance

 

 

 

 

 

01-Aug

Balance brought fwd.

 

19704.00

19704.00

01-Aug

Wages

680.00

 

19024.00

01-Aug

Gas

400.00

 

18624.00

01-Aug

Parts for Equipment

1900.00

 

16724.00

02-Aug

Wages

680.00

 

16044.00

02-Aug

Gas

400.00

 

15644.00

03-Aug

Wages

680.00

 

14964.00

03-Aug

Gas

300.00

 

14664.00

03-Aug

FAX

20.00

 

14644.00

03-Aug

Phone Call

8.00

 

14636.00

04-Aug

Wages

680.00

 

13956.00

04-Aug

Gas

350.00

 

13606.00

07-Aug

Wages

680.00

 

12926.00

07-Aug

Gas

350.00

 

12576.00

07-Aug

Phone Call

41.00

 

12535.00

08-Aug

Wages

680.00

 

11855.00

08-Aug

Gas

350.00

 

11505.00

08-Aug

Phone Call

22.00

 

11483.00

09-Aug

Wages

680.00

 

10803.00

09-Aug

Gas

300.00

 

10503.00

09-Aug

Equipment Repairs

80.00

 

10423.00

10-Aug

Cash Deposit

 

25000.00

35423.00

10-Aug

Vehicle Repairs

740.00

 

34683.00

10-Aug

Wages

680.00

 

34003.00

10-Aug

Gas

350.00

 

33653.00

11-Aug

Wages

680.00

 

32973.00

11-Aug

Gas

350.00

 

32623.00

11-Aug

Xerox

11.00

 

32612.00

14-Aug

Wages

680.00

 

31932.00

14-Aug

Gas

400.00

 

31532.00

14-Aug

Phone Call

49.00

 

31483.00

14-Aug

200 Metel flag holders

1200.00

 

30283.00

15-Aug

Wages

680.00

 

29603.00

15-Aug

Gas

350.00

 

29253.00

15-Aug

Phone Call

8.00

 

29245.00

16-Aug

Wages

680.00

 

28565.00

16-Aug

Gas

400.00

 

28165.00

16-Aug

Phone Call

8.00

 

28157.00

16-Aug

Sound System

2900.00

2900.00

28157.00

16-Aug

Batteries

26.00

 

28131.00

17-Aug

Wages

680.00

 

27451.00

17-Aug

Gas

350.00

 

27101.00

17-Aug

Phone Call

16.00

 

27085.00

18-Aug

Wages

680.00

 

26405.00

18-Aug

Gas

350.00

 

26055.00

19-Aug

Wages

680.00

 

25375.00

19-Aug

Gas

300.00

 

25075.00

19-Aug

2 "T" Oil

354.00

 

24721.00

21-Aug

Wages

680.00

 

24041.00

21-Aug

Gas

300.00

 

23741.00

21-Aug

Phone Call

8.00

 

23733.00

21-Aug

Payment for Crypt

 

6000.00

29733.00

22-Aug

Name tags

180.00

 

29553.00

22-Aug

Wages

680.00

 

28873.00

22-Aug

Gas

200.00

 

28673.00

23-Aug

Gas

250.00

 

28423.00

23-Aug

Flag Repairs

300.00

 

28123.00

23-Aug

Phone Call

8.00

 

28115.00

23-Aug

Payment for Crypt

 

6000.00

34115.00

24-Aug

Gas

250.00

 

33865.00

25-Aug

Wages

680.00

 

33185.00

25-Aug

Gas

300.00

 

32885.00

25-Aug

Purchess of Crypt

6000.00

 

26885.00

28-Aug

Wages

680.00

 

26205.00

28-Aug

Gas

350.00

 

25855.00

29-Aug

Wages

680.00

 

25175.00

29-Aug

Gas

300.00

 

24875.00

30-Aug

Wages

520.00

 

24355.00

30-Aug

Gas

300.00

 

24055.00

30-Aug

Transmission Fluid

75.00

 

23980.00

31-Aug

Wages

680.00

 

23300.00

31-Aug

Gas

300.00

 

23000.00

31-Aug

New Weedeater

9900.00

 

13100.00

31-Aug

Weedeater Cord

170.00

 

12930.00

31-Aug

Equipment Repairs

250.00

 

12680.00

31-Aug

2 "T" Oil

472.00

 

12208.00

         
 

Balance

47396.00

59604.00

12208.00

 

 

 

 

 
Home News Canteen History CleftPalette WhereToStay PupTent Cemetery Links Pictures